To operate in the electricity, natural gas and petroleum markets in Türkiye, a licence is obtained from the Energy Market Regulatory Authority (EPDK). In the electricity market, licences are granted to legal entities, and private-law legal entities that will operate in the market must be incorporated as a joint stock company (anonim şirket) or a limited liability company (limited şirket). A separate licence is obtained for each activity and, where an activity is carried out at more than one facility, for each facility. (Electricity Market Law No. 6446, Art. 4/3, 5)
In the natural gas market, too, a separate licence is required for each activity, and all of the company’s shares must be registered shares. (Natural Gas Market Law No. 4646, Art. 4/3, 6) In the petroleum market, licences are granted, updated, temporarily suspended and cancelled by the Authority. (Petroleum Market Law No. 5015, Art. 3)
The decision on the application rests with EPDK. KEYBIZ CPAs & Advisors compares the applicant company’s capital and shareholding structure with the licence requirements, and prepares any necessary company formation or capital increase, the financial part of the application file and the post-licence accounting records. Technical reports, connection opinions and legal assessments are issued by engineering firms authorised in this field, the relevant public bodies and the company’s lawyer; we coordinate the collection of these documents.
Licence Types by Market
| Activities Requiring a Licence | Company and Term Requirements | |
|---|---|---|
| Electricity (Law No. 6446) | Generation, transmission, distribution, wholesale, retail sale, market operation, import, export and aggregation (Art. 4) | Joint stock or limited liability company; licences are granted for a maximum of 49 years, and the minimum term for generation, transmission and distribution licences is 10 years (Art. 4/3, 5/2-c) |
| Natural Gas (Law No. 4646) | Import, transmission, storage, wholesale, export, urban distribution, CNG distribution and transmission, LNG liquefaction (Art. 4) | Company whose shares are all registered shares; licences are granted for a minimum of 10 and a maximum of 30 years; applications are answered within at most 60 days (Art. 4/2, 4/3, 6) |
| Petroleum (Law No. 5015) | Refining, processing, lubricant production, storage, transmission, eligible consumer and bunker supply (ihrakiye) activities; fuel distribution, transport and dealership (Art. 3) | Private-law legal entities within the scope of a licence are subject to the Turkish Commercial Code; licence terms are set by the Authority’s regulations (Art. 3) |
Current texts of Laws No. 6446, 4646 and 5015 on mevzuat.gov.tr (November 2026).
Company FormationPre-Licence and Licence in the Electricity Market
Pre-licence: For generation activities, a pre-licence (önlisans) is granted before the licence so that the necessary permits can be obtained and the facility site secured. The pre-licence term may not exceed 24 months, excluding force majeure. Until the licence is obtained, a direct or indirect change in the shareholding structure or a share transfer may lead to cancellation of the pre-licence, except in the cases listed in the regulation. (Law No. 6446, Art. 6; Electricity Market Licensing Regulation, Art. 19/4)
Capital: At the pre-licence application, the company’s minimum capital is raised to 5% of the total investment amount projected by the Authority for the generation facility, and at the generation licence stage to 20%. For nuclear and domestic coal-based facilities, this ratio is 1% at the pre-licence stage and 5% at the licence stage; for YEKA (Renewable Energy Resource Area) facilities with a mechanical capacity above 100 MW, 5% applies at the licence stage. For supply and aggregator licence applications, the minimum capital is the amount set by Board decision. (Electricity Market Licensing Regulation, Art. 12/5-b, 20/4-b, 20/6-d)
Collateral: At the pre-licence application, collateral is provided in the amount per installed capacity set by Board decision. (Electricity Market Licensing Regulation, Art. 12/5-a)
Licence transfer and shareholder information: A licence may not be transferred; certain restructuring transactions listed in the Regulation are outside this rule. For licence holders whose tariffs are regulated, shareholders holding 10% or more of the shares, and for publicly held companies 5% or more, are shown in the licence together with their shareholding ratios. (Electricity Market Licensing Regulation, Art. 3/3, 10/2-c)
Unlicensed generation: Renewable energy facilities within certain installed capacity limits, facilities where generation is consumed at the same metering point, and other facilities listed in the Law are exempt from the obligation to obtain a licence and to establish a company. (Law No. 6446, Art. 14) Which limit applies is checked separately according to the type of facility.
EPDK Application Preparation Process
-
Determining the Activity and Licence Type
We determine in which market and under which licence type the planned activity falls, whether a pre-licence is required and whether the activity is exempt from licensing.
-
Aligning the Company Structure
The applicant company’s type, shareholding structure and articles of association are compared with the relevant Law and Regulation. In the electricity market, the shares of joint stock companies applying for a pre-licence or licence that are not traded on the stock exchange must be registered shares. (Electricity Market Licensing Regulation, Art. 12/3, 20/3) If a new company is needed, see our Company Formation page for formation and our Company Formation with Foreign Shareholders page for structures with foreign shareholders.
-
Capital and Collateral
The minimum capital required for the licence type is calculated, a capital increase is made if necessary and a letter of guarantee is obtained. For pre-licence applications, the bank letter of guarantee is delivered to the Authority within five business days of the application. (Electricity Market Licensing Regulation, Art. 12/5-a)
-
Preparing the Application File
KEYBIZ CPAs & Advisors prepares the financial part of the file.
- Tables on the capital and shareholding structure
- Trade registry records and articles of association
- Information on the shareholders to be shown in the licence
- Investment amount and financing tables
- Documents on collateral and fee payments
Technical reports and connection opinions are obtained from the relevant authorities and firms and added to the file.
-
Electronic Application and Fees
In the electricity market, applications are made through the EPDK Application System; the company notifies the Authority in writing of the person authorised to make the electronic application. (Electricity Market Licensing Regulation, Art. 20/1, 20/2) Licence issuance, renewal, amendment and annual licence fees are set by the Board and paid to the Authority. (Law No. 6446, Art. 5/2-ç)
-
Post-Licence Records
Licence-holding legal entities keep their statutory books and records available for inspection by the Authority and provide the requested information and documents on time, completely and accurately. For activities whose tariffs are regulated, separate accounts and records are kept for each activity and region. (Law No. 6446, Art. 5/2-b, 5/2-d) For bookkeeping, see our Statutory Bookkeeping page.
Frequently Asked Questions
Is It Necessary to Establish a Company for an EPDK Licence?
Yes. In the electricity market, licences are granted to legal entities, and private-law legal entities must be incorporated as a joint stock or limited liability company. The cases of unlicensed generation listed in the Law and the exceptions for organised industrial zones are outside this rule. (Law No. 6446, Art. 4/3, 5, 13, 14)
How Long Is the Pre-Licence Term?
The pre-licence term may not exceed 24 months, excluding force majeure. The Authority may extend this term by up to half of its length. (Law No. 6446, Art. 6/5)
Can Shares Be Transferred during the Pre-Licence Period?
Until the licence is obtained, a direct or indirect change in the shareholding structure or a share transfer may lead to cancellation of the pre-licence, except in the cases listed in the Regulation, such as inheritance and bankruptcy. (Law No. 6446, Art. 6/3; Electricity Market Licensing Regulation, Art. 19/4-a) Planned transfers are assessed before the application.
How Is the Minimum Capital Calculated?
For generation facilities, the minimum capital is calculated as a ratio of the total investment amount projected by the Authority: 5% at the pre-licence application and 20% for the generation licence; for nuclear and domestic coal facilities, 1% at the pre-licence and 5% at the licence; for YEKA facilities with a mechanical capacity above 100 MW, 5% at the licence. For supply and aggregator licences, the amount is set by Board decision. (Electricity Market Licensing Regulation, Art. 12/5-b, 20/4-b, 20/6-d)
How Long Is the Licence Term?
In the electricity market, licences are granted for a maximum of 49 years; the minimum term for generation, transmission and distribution licences is 10 years. (Law No. 6446, Art. 5/2-c) In the natural gas market, licences are granted for a minimum of 10 and a maximum of 30 years. (Law No. 4646, Art. 6)
Can a Licence Be Transferred to Another Company?
In the electricity market, a licence may not be transferred. Certain mergers, demergers and transactions within the same shareholding structure listed in the Regulation are outside this rule and, as a rule, require Board approval. The approved transaction must be completed within the period set in the Regulation; otherwise the approval becomes invalid. (Electricity Market Licensing Regulation, Art. 3/3)
Legal Basis
- Electricity Market Law No. 6446 (6446 sayılı Elektrik Piyasası Kanunu) Art. 4, 5, 6, 13, 14, Official Gazette 30.03.2013, 28603
- Electricity Market Licensing Regulation (Elektrik Piyasası Lisans Yönetmeliği) Art. 3, 10, 12, 19, 20, Official Gazette 02.11.2013, 28809 (last amendment Official Gazette 19.10.2026, 33405)
- Natural Gas Market Law No. 4646 (4646 sayılı Doğal Gaz Piyasası Kanunu) Art. 4, 6, Official Gazette 02.05.2001, 24390
- Petroleum Market Law No. 5015 (5015 sayılı Petrol Piyasası Kanunu) Art. 3, Official Gazette 20.12.2003, 25322
Ask about EPDK Energy Market Licences
Fill in the form to contact us. The service field is preselected for this page and can be changed.