Preparation of financial records and documents for industrial businesses obtaining a capacity report through their chamber, registering with the industrial registry via the Industrial Registry Information System, and filing the annual business schedule and change notifications.

Contact form
Industrial drilling machine in a metalworking workshop

Overview

A capacity report (kapasite raporu) is a document showing the theoretically calculated maximum production capacity of businesses operating in industrial production and industrial services. Capacity reports are issued by the chamber with which the industrialist is registered, and reviewed and approved by the Union of Chambers and Commodity Exchanges of Türkiye (TOBB). (Law No. 5174, Art. 12, 56; TOBB Procedures and Principles 2025/53, Art. 1, 4)

An industrial registry certificate (sanayi sicil belgesi) is issued upon registration of an industrial business in the industrial registry kept by the Ministry of Industry and Technology, and is presented to authorised officials when required. (Industrial Registry Law No. 6948, Art. 2) The capacity information in the registry for small, medium and large businesses is based on the capacity report; for micro businesses without a capacity report, the business’s own declaration is used. (SGM 2026/4 Communiqué, Art. 10)

The capacity determination is made by the expert panel appointed by the chamber, and the registration by the Ministry’s provincial directorate. KEYBIZ CPAs & Advisors handles the financial side of these processes: preparing the list of machinery and equipment and the balance sheet values from the fixed asset records, reconciling the Social Security Institution (SGK) service lists with the payroll records, extracting turnover, import and export information from the books, and preparing the data for the annual business schedule. For permits in which the capacity report is used, see our Foreign Trade Permits page.

Capacity Report and Industrial Registry Certificate

Capacity ReportIndustrial Registry Certificate
Issued ByIssued by the chamber at the location of the production facility and approved by TOBB (Procedures and Principles, Art. 6, 7)Ministry of Industry and Technology; the application is assessed by the provincial directorate in the province where the production site is located (Communiqué, Art. 5)
Where to ApplyTOBB Industrial Information System (SBS) (Procedures and Principles, Art. 7)Industrial Registry Information System (SSBS) via e-Devlet (e-Government) (Communiqué, Art. 10)
ReviewExpert examination at the premises by a panel consisting of a rapporteur and at least one SKR expert (Procedures and Principles, Art. 7, 8)On-site inspection by the provincial directorate (Communiqué, Art. 5)
ValidityUp to two years; up to one year in sectors determined by the Union (Procedures and Principles, Art. 12)Depends on submission of the annual business schedule (Communiqué, Art. 7)
Per Production SiteA separate report for premises in different locations; premises completing the same production may be combined in a single report (Procedures and Principles, Art. 6)A separate application for each production site (Communiqué, Art. 4)

TOBB Procedures and Principles for the Issuance of Capacity Reports (2025/53); Industrial Registry Communiqué (SGM 2026/4), Official Gazette (Resmî Gazete) 01.04.2026, No. 33211.

Capacity Report Application Process

  1. Checking the Preconditions

    For a report to be issued, the premises must have an address, water and electricity must be available at the premises, the machinery and equipment must be installed and in working order during the panel’s visit, and the business address must have a number registered with the SGK, with at least one production employee, other than administrative staff, registered under that number. The firm must be registered with the chamber at the location of the production facility. (Procedures and Principles, Art. 6)

    No capacity report is issued to firms that have work done by contract manufacturers (fason) or to firms that rent part of a production facility or a production shift. (Procedures and Principles, Art. 6)

  2. Preparing the Documents and the SBS Application

    The firm applies by uploading the required documents and information to the Industrial Information System. (Procedures and Principles, Art. 7) The main documents required are the following (Procedures and Principles, Art. 9):

    • Title deed of the premises, land allocation deed in an organised industrial zone, or lease agreement
    • SGK insured service list for the staff at the premises
    • List of the machinery and equipment owned by the firm, approved by a sworn-in certified public accountant (YMM) or a certified public accountant (mali müşavir), and their total value in the balance sheet
    • For leased machinery and equipment, the lease agreement and the parties’ signature circulars; where applicable, the financial leasing agreement and payment plan
    • If subcontractors or temporary workers are employed, a notarised subcontracting agreement
    • Tax certificate (vergi levhası), the industrial registry certificate if any, and a list of quality certificates
    • Turnover, import and export information (on a declaration basis)

    The person applying on behalf of the firm is responsible for the accuracy of the documents uploaded to the system. Machines that are not installed at the premises and for which only a proforma invoice exists are not taken into account in the capacity calculation. (Procedures and Principles, Art. 9, 10)

  3. Examination of the Premises by the Expert Panel

    For the capacity determination, the chamber appoints a panel consisting of a rapporteur and at least one SKR expert. The SKR expert is an engineer registered in the system by the Union and authorised to issue the report, and must personally visit the premises and carry out an on-site expert examination to issue the report. (Procedures and Principles, Art. 4, 7, 8)

    Engineers employed by the firm or financially or technically connected with it may not act as experts for that firm’s report. (Procedures and Principles, Art. 8) As a rule, capacity is calculated on the basis of 8 hours a day and 300 days a year; for facilities with continuous production, on the basis of 24 hours a day and a maximum of 350 days a year. (Procedures and Principles, Art. 13)

  4. Issue by the Chamber and TOBB Approval

    The chamber issues the report within 1 month at most of the application and sends it to the Union; the Union reviews the report within 1 month at the latest of its receipt. A report found to meet the criteria is approved by electronic signature by the SKR expert, the chamber officer and the Union officer. (Procedures and Principles, Art. 6, 7)

  5. Validity, Amendment and Cancellation

    Capacity reports are approved with a validity period of up to two years; the end of the machine lease term or of the subcontracting agreement is taken as the end of the validity period, and for firms in liquidation the period is 6 months. (Procedures and Principles, Art. 12)

    An existing report cannot be amended for the addition or removal of machines affecting the capacity calculation, a change in production or the addition of a new product. The firm is obliged to notify the chamber of situations requiring a change to the report. (Procedures and Principles, Art. 14) The report is cancelled in cases such as transfer or lease of the premises, cessation of production or relocation of the production site. (Procedures and Principles, Art. 15)

Industrial Registry Registration and Obligations

  1. Pre-Registration and Registration Application

    Industrial businesses must pre-register with the industrial registry before starting production; the administrations issuing workplace opening and operating licences require a letter confirming registration with the industrial registry. Newly opened businesses send their declarations electronically to the Ministry within two months of the date they start operating. (Law No. 6948, Art. 2) For the licensing process, see our Workplace Opening and Operating Licence page.

    In the application, the declaration in the Industrial Registry Information System is completed accurately and in full, and the required documents are uploaded to the system; if there is more than one production site, a separate application is made for each. (SGM 2026/4 Communiqué, Art. 4)

  2. Provincial Directorate Review and Certificate

    The application is assessed by the provincial directorate in the province where the production site is located through an on-site inspection and, if found suitable, approved. The certificate date is the date on which the application was completed and sent for the provincial directorate’s approval. (SGM 2026/4 Communiqué, Art. 5) The certificate shows the certificate number, tax or Turkish identity number, trade name, address, production activity and validity date. (Communiqué, Art. 10)

    Businesses whose investment is largely complete, whose domestic machines have been installed and for whose imported machines an irrevocable letter of credit has been opened, but which cannot start production because they cannot obtain raw materials, may be given a letter, based on the result of the on-site inspection, stating that they will be registered when they start production. (Communiqué, Art. 9)

  3. Annual Business Schedule

    Industrial businesses report their activities for the year in the annual business schedule (yıllık işletme cetveli) and send it to the Ministry within four months at the latest of the end of the calendar year. (Law No. 6948, Art. 5)

    The validity of the industrial registry certificate depends on submission of the annual business schedule. For a business that submits the schedule, the validity date is set as the last day of the schedule submission period of the following year; only businesses holding a certificate with a current validity date benefit from the exemptions and rights linked to the industrial registry certificate. (SGM 2026/4 Communiqué, Art. 7)

  4. Notification of Changes and Cancellation

    Changes to the information in the registry and the temporary or permanent closure of the business are notified within one month. (Law No. 6948, Art. 4) On a change of trade name, actual production site address or production activity, the certificate is reissued with the same date and number; on a transfer, merger, demerger or change of legal form, a new certificate is issued with a new date and number. (SGM 2026/4 Communiqué, Art. 6)

    If production ceases, the business applies for cancellation; the certificate may also be cancelled ex officio following an on-site inspection. (Communiqué, Art. 8) Failure to comply with the registration, change notification and annual business schedule obligations is subject to an administrative fine. (Law No. 6948, Art. 9)

Frequently Asked Questions

Who Issues the Capacity Report?

The capacity report is issued by the chamber at the location of the production facility and approved by TOBB. Where the chambers of commerce and industry are separate, the report for industrialists is issued by the chamber of industry. The report is based on an expert examination at the premises by the expert panel appointed by the chamber. (Law No. 5174, Art. 12, 56; Procedures and Principles, Art. 6, 7, 8)

What Is the Accountant’s Role in the Capacity Report?

The list of machinery and equipment owned by the firm and their total value in the balance sheet are uploaded to the system with the approval of a sworn-in certified public accountant (YMM) or a certified public accountant (mali müşavir). (Procedures and Principles, Art. 9) Calculating the capacity, however, is the work of the SKR expert; the accountant does not determine capacity.

Must Micro Businesses Obtain a Capacity Report?

In the industrial registry, the capacity information of micro businesses without a capacity report is based on the business’s own declaration. For small, medium and large businesses, the capacity report is used. (SGM 2026/4 Communiqué, Art. 10) If another authority’s legislation requires a capacity report, this is assessed separately.

How Long Is a Capacity Report Valid?

Up to two years; up to one year in sectors determined by the Union. If the machine lease term or the subcontracting agreement ends earlier, that date is used. For machines obtained through financial leasing, two years applies regardless of the leasing term. (Procedures and Principles, Art. 12)

Is the Capacity Report Updated When a New Machine Is Purchased?

An existing report cannot be amended for the addition or removal of machines affecting the capacity calculation, a change in production or the addition of a new product; the firm notifies the chamber of the situation. (Procedures and Principles, Art. 14) Changes to the production information in the industrial registry are also notified within one month. (Law No. 6948, Art. 4) For machines covered by an investment incentive certificate, see our Investment Incentive Certificate page.

What Happens If the Annual Business Schedule Is Not Submitted?

The validity date of the industrial registry certificate is not renewed; with a certificate whose validity date is not current, the exemptions and rights linked to the certificate cannot be used. When the schedule is submitted, the validity is renewed. (SGM 2026/4 Communiqué, Art. 7) Failure to submit the schedule on time is also subject to an administrative fine. (Law No. 6948, Art. 5, 9)

What Happened to Visas Obtained under Communiqué No. 2014/11?

The SGM 2026/4 Communiqué entered into force on 15.04.2026 and repealed the SGM 2014/11 Communiqué. For certificates whose visa is still running, the validity date is taken as the visa expiry date; if the annual business schedule is submitted, validity is determined under Article 7 of the Communiqué, but the visa period is not shortened. (SGM 2026/4 Communiqué, Art. 11, 12, provisional Art. 1)